Genser Energy is developing a 25MW wind project in eastern Ghana. We have installed a 100m Met Mast at the project location and have commenced data collection and monitoring for a feasibility study. Construction, installation, and grid connection will take approximately 18 months from final site design selection. Ultimately, the installation will be connected to the national grid and the energy sold to our commercial customers.
Wind Power
- Operations
- Ghana
- Wind Power