top of page
Property Description
The Edikan plant is situated in Central Ghana and supplies power to the Perseus mine, run by Perseus Mining Ghana Limited, an Australian listed company.
The Edikan plant is gas fired with a 33MW capacity generated from two 16.5MW Solar Titan 130 gas turbines together with accessories. The plant is connected to natural gas via our dedicated 57km 12” branch pipeline from the main primary pipeline. The Edikan plant was commissioned during September 2021 with commercial operations starting in August 2022.
Contact Agent
33MW
Property Details
Property Type
2021
Bedrooms
2021
Bathrooms
Size
Floors
Year Built
Property Location
Central Region, Ghana
bottom of page